Tags:
create new tag
view all tags

Swiss WLCG Operations Meeting on 2011-09-13

Agenda

Status

  • CSCS:
    • Update of the recent issues with Lustre and Cream.
    • ARC Accounting and BDII.
    • Status of EMI1 upgrade
    • Migration to GPFS
  • PSI (reports Fabio):
  • UNIBE (reports Gianfranco):
    • Stable operations, ATLAS production and analysis. Also some SMSCG activity
    • Running stably with CVMFS since a few months now
    • Had to recover DPM install because of EPEL conflict (operations not affected)
    • Upgrade to ARC1 postponed due to Lustre bugs
    • Starting now with KVM
  • UNIGE (reports Szymon):
    • Daily operations very stable and quiet, nothing to report.
    • A major upgrade of storage going ahead:
      • IBM x3630 M3 with 12 x 3 TB of disk for data + two small disks for the OS
      • hardware RAID, we will do RAID 6 with cold spares, 27.5 TB net/machine
      • we are getting 10 machines, only 8 can be powered up soon
      • to stay in fixed kW budget we will retire 12 login machines, in operation since 2005
      • most of the new disk servers will be added to our Storage Element
Other topics
  • CernVMFS updates (the requirements meeting is a different meeting)
  • Convenience of the actual Date/Time for this meetings
AOB

Attendants

  • CSCS: Pablo, Miguel
  • CMS: Fabio
  • ATLAS: Gianfranco
  • LHCb:Roland
  • EGI:

Action items

  • Item1
Edit | Attach | Watch | Print version | History: r18 < r17 < r16 < r15 < r14 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r18 - 2011-09-18 - FabioMartinelli
 
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback