Swiss WLCG Operations Meeting on 2012-01-12
Agenda
Status
- CSCS (reports Pablo):
- Vacation period status
- Entering Phase E
- Computing Expansion. AMD CPUs on all 10 Dalco nodes were updated to Interlagos, increasing the cluster capacity by 252 HS06 and 80 job slots.
- Storage Thumpers substitution. All Thumpers are empty and switched off. Replacement has also provided some extra space, rising our total to 1.11 PB (base10), or 557 TB per experiment.
- Lustre to GPFS migration. Lustre is finally out of our system, leaving us with GPFS only. No software raids, two copies per file, metadata in SSD.
- Next purchase: Phase F worker nodes for the new building
- Problems with atlasprd on Dalco nodes: https://ggus.eu/ws/ticket_info.php?ticket=77901
- PSI (reports Fabio):
- UNIBE (reports Gianfranco):
- Operation report
- Update on transfer rate degradation from NDGF / ND cloud
- Phase C worker nodes move to Bern
- UNIGE (reports Szymon):
Other topics
- ATLAS Distributed Computing worldwide downtime on 16-17 Jan
- ATLAS will start testing glexec capability at sites via glideinWMS
AOB
Attendants
- CSCS: Pablo
- CMS:
- ATLAS: Gianfranco
- LHCb:
- EGI:
Action items