Service Challenge Information
Site logs for Phoenix
STEP09
- Baseline services versions for STEP09
- dCache-1.9.2-6, but we should be able to live with the present system...
- lcg-CE 3.1.25-0
- WN 3.1.15-0
- UI 3.1.30-0
- ARC server 0.6
ATLAS / STEP09
- Coordinator: Graeme Stewart, graeme.andrew.stewart@cernSPAMNOT.ch
- Dates: May 25-31 Setup, June 1-14 Running.
- Tier-2s will participate in MC simulation and in user analysis components of the challenge. User analysis in the EGEE clouds will happen through both WMS job submission and through pilot jobs. To facilitate this Tier-2s should configure their batch systems to accept the /atlas/Role=pilot VOMS role and set up the following shares:
- Since we have both ARC and gLite front ends, they should both feed these shares.
- ganga job robot reports. This activity is led by Johannes Elmsheuser. Some of his jobs caused massive I/O problems through multiple dccp staging commands. This has been debugged by Riccardo, Fotis and me (added by Derek).
CMS / STEP09
CCRC08
ATLAS CCRC08
The Full Dress Rehearsal is part of CCRC08. This means that a realistic data sample according to ~1 day of data taking is distributed
according to the computing model. Phoenix (Sigve) has asked for our share. If a site is not ready with srmv2 and the space tokens,
centrally bulk deletion will not be used. Instead a manual deletion by cloud manager is performed.
- ATLAS CCRC08 Information page
- Recent talk by Kors.
- Space tokens for ATLAS. Only ATLASDATADISK and ATLASMCDISK seem to be needed for CCRC08. For instance "token:ATLASDATADISK:srm://srm.grid.sara.nl:8443/srm/managerv2?SFN=/pnfs/grid.sara.nl/data/atlas/atlasdatadisk/" Only the production role should have write access. All tokens are of type "T0D1". ATLASDATADISK should be 2TB. ATLASMCDISK 10TB. NB Numbers for CCRC08. They will change.
- TiersOfATLAS shows srm endpoints with space tokens for other sites.
CMS CCRC08
CMS CSA07
- Informational pages
- Tasks for us to complete
- Interesting links
Service Challenge 4 and CSA06 information
Service Challenge 4 (SC4) had begun on June 1st 2006 and ended in September. CMS is continuing
with the associated integration activities as long as they keep being useful.
During October and November of 2006 the
Computing, Software, and Analysis challenge (CSA06)
is running.
Links to external information
--
DerekFeichtinger - 18 Sep 2007