CMS Tier-3 News Item

annual power test at PSI 07.01-08.01.2017

Summary

PSI will perform a power test on the aforementioned dates, meaning any T3 computing will be unavailable at this time.

Details

As every year, PSI will perform a power test in the beginning of January 2017, on 07.01-08.01. This means all T3 services will be unavailable for this time, batch jobs will be killed.


JoosepPata 08. 12. 2016

T3NewsForm
Title annual power test at PSI 07.01-08.01.2017
Summary PSI will perform a power test on the aforementioned dates, meaning any T3 computing will be unavailable at this time.
User JoosepPata
Date 08. 12. 2016
Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2016-12-08 - JoosepPata
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback