CMS Tier-3 News Item

Annual power test at PSI on 07/08.01.2017

Summary

PSI will perform a power test on the aforementioned dates, meaning any T3 computing will be unavailable at this time.

Details

As every year, PSI will perform a power test in the beginning of January 2017, exactly on 07/08.01. This means all T3 services will be unavailable for this time, batch jobs will be killed.

The start/stop timeline will be the following :

  1. On Friday 06.01 at 16:00 all the T3 systems will be stopped.
  2. On both all Saturday 07.01 and Sunday 08.01 till the 20:00 the T3 will be completely unusable.
  3. Perhaps the T3 will be restarted already on Sunday 08.01 after the 20:00 by some T3 administrator.
  4. But officially the T3 will be back in production on Monday 9th at 12:00 in order to have enough time to restart and check everything.


JoosepPata 08. 12. 2016

T3NewsForm
Title Annual power test at PSI on 07/08.01.2017
Summary PSI will perform a power test on the aforementioned dates, meaning any T3 computing will be unavailable at this time.
User JoosepPata
Date 08. 12. 2016
Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r2 - 2016-12-08 - FabioMartinelli
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback