Tags:
create new tag
view all tags

Swiss WLCG Operations Meeting on 2010-09-30

Agenda

  • Cluster Status
    • New experiment software area done. Only Arc missing.
    • Security improvements (kernel / ssh)
    • More Lustre fun
    • CMS reports a substantial amount of job failures in CreamCE

  • Availability / Reliability values ticket status
    • OPS test jobs use a too low wall time for ARC CE. #62074
    • Availability / Reliability calculations July/August. #61953

  • Next maintenance day: Maintenance2010x10x04
    • Enable Multiple Mount protection on Lustre
    • Torque 2.5.2 and Moab on HA
    • Other operations

  • Review Action Items
    • CSCS Opening tickets for Avai/Reliab metrics (see above)
    • CSCS Request offers for storage from Bull (not done)
    • Lustre clients downgrade (reverted)

  • AOB

Attendants

  • ATLAS: Szymon
  • CMS: Derek, Leo
  • LHCb:
  • CSCS: Peter, Pablo
Edit | Attach | Watch | Print version | History: r7 < r6 < r5 < r4 < r3 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r7 - 2011-01-13 - PabloFernandez
 
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback